ARUSI is providing construction management services for the renovation of the 500-kV feeder substation to accommodate the loop-in of the Navajo-McCullough 500kV line and the 4 Crystal-Harry Allen transmission lines, which is the largest and most complex of the four substations being built.
ARUSI is currently working with SRP on various projects including overhead to underground conversions, relocation of existing utilities, new overhead and underground line extensions, feeder duct bank design, residential subdivision design, substation design, and in-house manpower resources.
ARUSI is assisting SWG with natural gas distribution franchise expansion by providing engineering and design services for utility relocation designs, mainline extensions, abandonment designs, subdivision designs, research and coordination of utility conflicts, and new construction.